A lot - A LOT - has happened since my last post about the house. We've painted the entire outside. We have electricity. The AC is hooked up and running. The cabinets and trim are installed. The granite counter tops are in (and beautiful!). The cabinets have been stained (gorgeous!). The painters are painting as we speak. The carpet will be installed this week. The plumber will be in tomorow to install faucets, etc. We've picked out the backsplash for the kitchen and the tub surround for both bathrooms. We've decided on hardwood flooring (we just have to go order it), but we still need to pick out the tile flooring. And that should be about it. The light at the end of the tunnel is becoming so much brighter... Just in time for the start of hurricane season, which, by the way, is less than a week away. But who's counting? Here are some pics from the action at the house. Hopefully later this week I'll have some of the entire inside of the house, freshly painted and carpeted.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment